Industry and commerce

Kaltenkirchen, Germany

New build of a production hall

From planning to turnkey handover, completely to passive house standard, customer: Höhne GmbH

Key facts
Surface area 5,344.38 m²
Services From planning to turnkey handover

The rear of the 4,160 m² hall is used as a warehouse, while production takes place at the front, adjacent to the office. An F90 fire wall divides the space into two sections. The external and internal wall structure of the three-storey office also comprises prefabricated elements (timber frame construction) and was erected on-site.

The ceiling separating the ground floor and first floor was delivered and installed as a complete glued laminated timber ceiling. The entire building meets the passive house standard.